• China Products/Suppliers. Carbon Steel Pipe ERW Techniques 20mn2 35mn2 45mn2 Q390c Square Tube 10inchcarbon Steel Pipe for Oil and Gas Pipeline Construction
  • China Products/Suppliers. Carbon Steel Pipe ERW Techniques 20mn2 35mn2 45mn2 Q390c Square Tube 10inchcarbon Steel Pipe for Oil and Gas Pipeline Construction
  • China Products/Suppliers. Carbon Steel Pipe ERW Techniques 20mn2 35mn2 45mn2 Q390c Square Tube 10inchcarbon Steel Pipe for Oil and Gas Pipeline Construction
  • China Products/Suppliers. Carbon Steel Pipe ERW Techniques 20mn2 35mn2 45mn2 Q390c Square Tube 10inchcarbon Steel Pipe for Oil and Gas Pipeline Construction
  • China Products/Suppliers. Carbon Steel Pipe ERW Techniques 20mn2 35mn2 45mn2 Q390c Square Tube 10inchcarbon Steel Pipe for Oil and Gas Pipeline Construction
  • China Products/Suppliers. Carbon Steel Pipe ERW Techniques 20mn2 35mn2 45mn2 Q390c Square Tube 10inchcarbon Steel Pipe for Oil and Gas Pipeline Construction

China Products/Suppliers. Carbon Steel Pipe ERW Techniques 20mn2 35mn2 45mn2 Q390c Square Tube 10inchcarbon Steel Pipe for Oil and Gas Pipeline Construction

Type: Seamless Steel Pipe, Square Tube
Standard: GB
Shape: Round, Square Shape
Surface Treatment: Galvanized
Application: Oil Pipe, Structure Pipe
Invoicing: by Theoretical Weight
Customization:
Manufacturer/Factory, Trading Company, Other, Group Corporation
Diamond Member Since 2023

Suppliers with verified business licenses

Shandong, China
Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Fast Delivery
The supplier can deliver the goods within 15 days
ODM Services
The supplier provides ODM services
to see all verified strength labels (10)
  • Overview
  • ZHONGNENGGANGLIAN
  • Our Advantages
Overview

Basic Info.

Surface
Customers′t Requirement
Outer Diameter
57 - 325
Technology
Hot Rolled Cold Rolled ERW
Special Pipe
API Pipe
Oiled or Non-Oiled
Non-Oiled
Usage
Construction Structure
Color
Black....as Customers′ Requirement
End Protector
Plastic Pipe Cap
Grade
Carbon Steel
Material
Q195/Q215/Q235/Q345
Processing Service
Welding, Punching, Cutting, Bending, Decoiling
Length
12m, 6m, 6.4m
Delivery Time
Within 7 Days
Certificate
CE, ISO9001
Trademark
ZNGL
Origin
Shandong, China
Production Capacity
2500 Ton/Tons Per Week

Product Description

 

ZHONGNENGGANGLIAN

China Products/Suppliers. Carbon Steel Pipe ERW Techniques 20mn2 35mn2 45mn2 Q390c Square Tube 10inchcarbon Steel Pipe for Oil and Gas Pipeline ConstructionChina Products/Suppliers. Carbon Steel Pipe ERW Techniques 20mn2 35mn2 45mn2 Q390c Square Tube 10inchcarbon Steel Pipe for Oil and Gas Pipeline ConstructionChina Products/Suppliers. Carbon Steel Pipe ERW Techniques 20mn2 35mn2 45mn2 Q390c Square Tube 10inchcarbon Steel Pipe for Oil and Gas Pipeline ConstructionChina Products/Suppliers. Carbon Steel Pipe ERW Techniques 20mn2 35mn2 45mn2 Q390c Square Tube 10inchcarbon Steel Pipe for Oil and Gas Pipeline Construction

Type Carbon Steel Pipe 
Materials API 5L /A53 /A106 GRADE B and other material which client inquired
Size Outer Diameter Seamless:17-914mm 3/8"-36"
Wall Thickness SCH10 SCH20 SCH30 STD SCH40 SCH60 XS SCH80
SCH100 SCH120 SCH140 SCH160 XXS
Length Single random length/Double random length
5m-14m,5.8m,6m,10m-12m,12m or as customer's actual request
Ends Plain end/Beveled,protected by plastic caps on both ends, cut quare,grooved,threaded and coupling,etc.
Surface Treatment Bare,Painting black,varnished,galvanized,anti-corrosion 3PE PP/EP/FBE coating
Technical Methods Hot-rolled/Cold-drawn/Hot-expanded
Testing Methods Pressure test,Flaw detection,Eddy current testing, Hydro static testing or Ultrasonic examination and also with chemical and physical property inspection
Packaging Small pipes in bundles with strong steel strips,large pieces in loose; Covered with plastic woven bags; Wooden cases; Suitable for lifting operation; Loaded in 20ft 40ft or 45ft container or in bulk; Also according to customer's requests
Origin China
Application Conveying oil gas and water
Third Party Inspection SGS BV MTC
Trade Terms FOB CIF CFR
Payment Terms FOB 30%T/T, 70% before shipment
CIF 30% pre-payment and the balance to be paid before making shipment or
Irrevocable 100% L/C at sight
MOQ 10 tons
Supply Capacity 5000 T/M
Delivery Time Usually within 10-45 days after receipt of advance payment
Our Advantages

 


China Products/Suppliers. Carbon Steel Pipe ERW Techniques 20mn2 35mn2 45mn2 Q390c Square Tube 10inchcarbon Steel Pipe for Oil and Gas Pipeline Construction

 

 

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2023

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company, Other, Group Corporation
Registered Capital
10000000 RMB
Plant Area
101~500 square meters